Wastewater/Stormwater
- NPDES, SID and UIC Permitting and Consulting
- Stormwater Pollution Prevention Plans
- Spill Prevention Control and Countermeasures Plans
- Stormwater Permitting
Hazardous and Solid Waste
- Part A and Part B Permitting
- RCRA Facility Investigations
- Closure and Post-Closure Plan Preparation
- Hazardous Waste Biennial Reporting
- Hazardous Waste Management Plans
- Soil and Groundwater Contamination Assessments
- Corrective Action Design and Implementation
- Risk-Based Corrective Action
Brownfield Redevelopment/Voluntary Cleanup Program
- VCP Application
- Assessment Plans
- Corrective Action Plans
Groundwater Investigations
- Hydrogeologic Investigations
- Monitoring Well Network Design and Installation
- Groundwater Modeling
- Pumping Test
- Dye Trace Studies
- Wellhead Protection Studies
- Fate and Transport Modeling
Solid Waste/Landfill Services
- Hydrogeologic Investigations
- Monitoring Well Network Design and Installation
- Groundwater Modeling
- Low Stress Purging and Sample Collection
- Groundwater Sampling
- Statistical Analysis
- Alternate Source Demonstrations
- Permitting Assistance
Environmental Assessments and Audits
- Phase I Environmental Site Assessments
- Phase II Environmental Site Assessments
- Facility Environmental Audits
- Environmental Impact Statements
- Risk Assessments
- Risk-Based Corrective Action
- Asbestos Surveys
Indoor Air Quality Testing and Assessment
- Indoor Air Quality Surveys and Assessments
- Airborne Contaminant Sampling
- Monitoring of Air Quality Comfort Parameters
- Microbiological Contaminant Sampling and Analysis
- OSHA Compliance Monitoring
- Vapor Intrusion Studies
- Recommendations for Corrective Actions
Construction Stormwater NPDES Services
- NPDES Permit Applications
- Site Inspection Services
- Best Management Practice Plan Preparation
- Surface Water Discharge Sampling
- Design of Erosion Control Measures
Community Right-to-Know
- Tier I and Tier II Reporting
- Toxic Chemical Release Reporting Form
- Emergency Release Reporting Plans
Underground Storage Tank Management
- Contractor, Alabama Tank Trust Fund
- UST Management
- UST Closure Assessments
- Preliminary Investigations
- Secondary Investigations
- Risk-Based Corrective Action
- Corrective Action Plans
- Remediation System Design and Implementation
Geophysical Surveys
- Ground Penetrating Radar
- Electromagnetic Surveys
- Magnetometer Surveys
Air Permitting
- Title V
- Synthetic Minor
- Pre-construction/PSD Avoidance
- Emissions Reporting & Inventories
- Compliance/Regulatory Assistance
WHAT OUR CLIENTS ARE SAYING:
“Highland Technical Services always responds on a timely basis, and they do quality work. They give us accurate findings, presented the right way to keep us in compliance. And they deliver excellent value.”